Doka is a construction company. They are currently working on the construction of buildings with about 50 floors.
To give a building floors and ceilings, you have to constantly lift a mold or a formwork table upwards. The mold is put in place and then walls are placed around it. Concrete is poured into the mold. As soon as the concrete is hard, the mold is removed again.
Normally, the mold is applied by hand plate by plate. This takes a lot of time. That is why Doka wanted to use one large, complete formwork table from now on. But hoisting such a huge mold to the top is a major challenge. That is why they called in BKRS to design and build a lifting trailer. With this equator, Doka can easily hoist the molds upwards.