• What Happens When a Crane Fails Inspection?

When a crane is rejected during an inspection, it must be taken out of service immediately. The crane may only be put back into operation after the identified defects have been remedied and a new, successful inspection has taken place. This applies to all types of crane systems in the Netherlands and Belgium. In this article, we answer the most frequently asked questions about crane rejection, responsibility, and the steps towards re-inspection.

What are the immediate consequences of a rejected crane?

The immediate consequences of a crane rejection are clear: the crane may no longer be used until the defects have been repaired and a re-inspection has been passed. The inspection authority records this in writing in an inspection report, which describes the identified shortcomings. This report forms the basis for the next steps.

In practice, a rejection means that the production or work process is directly disrupted. Depending on how heavily the crane is used, this can lead to considerable operational downtime. In addition, a rejection carries legal consequences: using a rejected crane is not only dangerous, but also a criminal offence. Employers can be held liable for accidents that occur with a crane that was previously rejected.

In addition to the operational and legal consequences, there are also financial implications. Repairs, a re-inspection, and any downtime costs add up quickly. This is precisely why it pays to invest preventively in maintenance and regular inspection.

Who is responsible after a crane rejection?

After a crane rejection, the responsibility lies primarily with the owner or user of the crane. In most cases, this is the employer or the company that operates the crane. They are legally obliged to take the crane out of service immediately and to ensure it is repaired before the crane is put back into use.

In the Netherlands, this responsibility stems from the Working Conditions Act (Arbowet) and the associated decrees. The employer must be able to demonstrate that work equipment, including cranes, is safe and complies with the applicable standards. An inspection report with a rejection is a formal signal that this obligation is not being met.

Is the crane hired? Then the lessor also plays a role. Rental contracts generally include agreements about who is responsible for maintenance and inspection. It is advisable to be well aware of these agreements, especially when a rejection occurs during the rental period.

May a rejected crane still be used?

No, a rejected crane may not be used. Taking the crane out of service is mandatory as soon as a rejection has been issued. Ignoring a crane rejection is a violation of the Arbowet and can lead to fines, suspension of activities, and in the event of accidents, criminal prosecution of the responsible persons.

There are no exceptions to this rule. Not even when the crane is only lightly loaded or when the defects appear minor at first glance. An inspection authority issues a rejection based on established standards, and those standards exist for good reason. Safety comes first, and the risk of serious accidents is real when a crane with defects remains in use.

Do you want to temporarily replace the crane with another solution while repairs are being carried out? Then make sure that the replacement solution also meets all safety requirements and is approved for use.

How is a crane approved after a rejection?

After a crane rejection, a fixed procedure is followed before the crane may be put back into service. First, the identified defects are repaired by a certified party. Then a re-inspection is carried out by an accredited inspection authority. Only when this re-inspection has been successfully completed and recorded in writing may the crane be put back into operation.

The re-inspection is not a formality. The inspection authority specifically checks whether the previously identified defects have been adequately remedied. Depending on the nature of the repairs, a full re-inspection of the entire crane may also be required, not just of the parts that were repaired.

It is important that all repairs are carried out by parties with the appropriate certification and knowledge of the relevant crane types. Documentation of the work carried out is essential, as the inspection authority needs to be able to verify exactly what was done and whether it was carried out in accordance with the applicable standards.

When is revision or replacement of a crane wiser than repair?

Revision or replacement is wiser than repair when repair costs amount to a large proportion of the replacement value, when the crane is structurally outdated, or when multiple critical components fail simultaneously. In such cases, a thorough revision or a new crane offers more certainty in the long term than a series of individual repairs.

There are a number of signals that indicate the need for revision or replacement:

  • The crane has reached or exceeded its technical service life
  • Repairs are becoming increasingly frequent and more expensive
  • Spare parts are difficult or no longer available
  • The crane no longer meets current safety standards, even after repair
  • The operational requirements have changed and the crane is no longer suitable for the current load or tasks

A thorough technical assessment by a specialist helps in making this consideration. Sometimes a partial revision of the most critical components is a cost-effective alternative that significantly extends the service life of the crane without the cost of a full replacement.

How do you prevent a crane from being rejected at the next inspection?

The best way to prevent a crane rejection is a consistent and documented maintenance programme. Regular preventive maintenance, combined with interim inspections, ensures that defects are identified and remedied early before they lead to a rejection during the formal inspection.

Concrete steps to prevent rejection:

  • Schedule annual inspections in good time and ensure the crane is fully available at that point
  • Carry out periodic preventive maintenance based on the intensity of use of the crane
  • Keep a logbook of all maintenance work carried out and parts replaced
  • Have daily visual inspections carried out by trained operators
  • Identify and report deviations, sounds, or behavioural changes of the crane immediately
  • Work together with a certified party for both maintenance and inspection

A good maintenance programme is not only an investment in safety, but also in the availability and service life of the crane. Companies that structurally invest in crane maintenance demonstrably have less unplanned downtime and lower total cost of ownership in the long term.

How we help with crane inspection, maintenance, and rejection

At BKRS, we understand that a crane rejection has a major impact on your business operations. We offer a complete package of services to support you both before and after a rejection:

  • Annual inspection and inspection: As an accredited inspection company, we carry out the legally required inspections for all types of crane systems
  • Preventive maintenance: We draw up a maintenance programme tailored to your specific crane and intensity of use, so that problems are prevented before they lead to rejection
  • Repair and revision: Our certified staff carry out repairs and revisions in accordance with the applicable standards, including the necessary documentation for re-inspection
  • Advice on replacement: When repair is no longer the best choice, we advise on the most suitable new crane solution for your situation
  • Single point of contact: From inspection to installation and from maintenance to re-inspection, we coordinate the entire process so that you can focus on your core activities

Would you like to know more about our crane services and maintenance programmes? Or do you have an immediate question about a rejected crane? Contact us and we will help you quickly and professionally.

Frequently Asked Questions

How quickly must a rejected crane be taken out of service?

A rejected crane must be taken out of service immediately, as soon as the rejection has been recorded in writing by the inspection authority. There is no grace period or transition period. Any further use after a rejection is a direct violation of the Arbowet.

How long does a re-inspection procedure take on average?

The duration of a re-inspection depends on the extent of the repairs required and the availability of an accredited inspection authority. In most cases, a re-inspection can be scheduled within a few days to two weeks after the repairs have been completed. Good documentation of the work carried out significantly speeds up this process.

What should I do if I disagree with the outcome of an inspection?

If you disagree with a crane rejection, you can request a second opinion from another accredited inspection authority. However, the crane remains out of service until a successful re-inspection has taken place. It is advisable to substantiate your objections in writing and consult with a specialist.

Is the lessor or the lessee responsible in the event of rejection of a hired crane?

This depends on the agreements in the rental contract. Generally, the lessor is responsible for the technical condition and inspection of the crane, while the lessee is responsible for correct use and daily inspections. Check your rental contract carefully and, if in doubt, contact the lessor immediately when a rejection occurs.